Vinyl Wall Protection Sheet Installation Guide for Healthcare and Commercial Projects

banner

Vinyl Wall Protection Sheet Installation Guide

February 13, 2023

VS Series Hygienic Vinyl Wall Panel Installation Guide

Vinyl Wall Protection Sheet Installation Guide | Step-by-Step Instructions for Healthcare & Commercial Buildings


1. Surface Preparation

Before installation, ensure the substrate wall is clean, dry, smooth, and structurally sound.
• Sand the wall with abrasive paper or apply a suitable primer to enhance adhesive bonding.
• The wall must meet flatness requirements: unevenness should be less than 2 mm within a 2-meter straightedge range.
Proper surface preparation ensures long-term adhesion and prevents panel deformation.


2. Accessory Installation & Adhesive Application

Install all required VS Series accessories—end trims, joint trims, inside corner profiles, etc.—onto the panel before mounting it on the wall.

Next, apply the recommended adhesive using a trowel:
• Spread adhesive both on the back of the VS wall panel and on the substrate wall surface.
• Ensure full-coverage application for optimal bonding strength.


3. Panel Positioning & Alignment

Align the prepared VS Series panel (together with its accessories) with the pre-measured installation line.

During installation:
• Use a plumb line and level line to maintain vertical and horizontal accuracy.
• Carefully press the panel onto the wall to match the predetermined layout and ensure seamless alignment.


4. Rolling & Final Bonding

Once the panel is fixed to the wall, use a heavy-duty roller to press firmly across the entire surface:
• Start from the center of the panel
• Roll outward toward the top, bottom, and edges

This process ensures:
• Full contact between panel and wall
• Removal of trapped air bubbles
• Enhanced surface flatness
• Strong, permanent adhesion



Inquiry

info@sjproduct.com

+86 19531351404

7

+86 19531351404